Honeywell scheda di rete HC900 Manuale

Manuali PDF
228 Pagine Italiano

Honeywell scheda di rete HC900
Installation Guide - Overview
50 HC900 Hybrid Controller Installation and User Guide Revision 5
9/03
Table 10 - Site and Equipment Preparation
Step Procedure Reference
1
Referring to Site Planning Documentation, ensure that
sufficient numbers of the following items are on hand:
Racks (4-, 8- and 12-slot)
Power Supplies (1 per rack)
Controller Module or Scanner (1 per rack)
I/O Modules (correct type for each configured slot)
Terminal Blocks, Barrier or Euro style, (1 for each I/O
Module)
Jumpers 2-position or 10-position, (for designated
Terminal Blocks)
Tie Wraps (1 or 2 for each Terminal Block)
I/O Label (one per terminal block, by module type)
Filler Block Cover (1 for each slot not occupied by an
I/O Module)
Blank label (1 for each Filler Block Cover)
Grounding Bars for I/O wiring shields (1 or 2 for each 4-
slots in each rack)
Wiring terminal lugs (for connecting I/O shields to
grounding bars)
Sheet metal screws, steel #10 or M4, for mounting racks
in enclosures (4 screws for 4-slot racks, 8 screws for 8- or
12-slot racks)
Site Planning Documentation
In this Manual:
Section on Pre-Installation
Planning.
Sections on installation
Appendix A
2
Install (or verify correct installation of) enclosures for HC900
Controllers and ancillary equipment:
Mounting rails or flat-panels
(for cabinet with multiple HC900 Chassis):
grounding bus
barrier strip for AC power
Master control Relay
Site Plan Documentation and
this section of this manual
3
Install (or verify correct installation of) enclosures ("closets")
for networking devices:
Appendix A.
Note : Some networking
devices may share enclosures
with HC900 Controller
components.
Manuali Correlati per Honeywell scheda di rete HC900